Topic |
DOT Docket Number |
Comments Due to APTA |
Comments Due to FTA |
APTA Comments |
Result |
Proposed General Directive 17–1; Stop Signal Overruns on Rail Fixed Guideway Public Transportation Systems: Notice of proposed general directive; request for comments
|
FTA-2016-0041
|
3/13/16 |
3/20/17 |
Final Comments 3/17/17 |
|
Passenger Equipment Safety Standards; Standards for Alternative Compliance and High-Speed Trainsets |
FRA–2013–0060 |
1/30/17 |
2/6/17 |
Extension Request 12/12/16
Additional Comments 8/21/17 |
|
Proposed Agency Information Collection Activities: Comment Request
|
FRA-2010-0002-N-23 |
11/15/16 |
11/22/16 |
Final Comments 11/22/16 |
|
Hazardous Materials: Enhanced Tank Car Standards and Operational Controls for High-Hazard Flammable Trains |
PHMSA–2017–0102 |
10/23/17 |
11/1/17 |
|
|
Railworthiness Directive for Certain Railroad Tank Cars Equipped With Bottom Outlet Valve Assembly and Constructed by American Railcar Industries and ACF Industries |
FRA-2016-0002 |
N/A |
N/A |
N/A |
|
Petition for Special Approval of Alternate Standard
|
FRA-2016-0045 |
N/A |
N/A |
N/A |
|
Competitive Passenger Rail Service Pilot Program: NPRM
|
FRA-2016-0023 |
8/15/16 |
8/22/16 |
|
|
Benefit-Cost Analysis Guidance for Rail Projects: Notice and Request for Comments
|
FRA-2016-0040 |
N/A |
N/A |
N/A |
|
Categorical Exclusion Survey Review
|
FRA-2016-0053 |
N/A |
N/A |
|
|
Railroad Safety Advisory Committee (RSAC): Charter Renewal
|
FRA-2000-7257 Notice 82 |
N/A |
N/A |
N/A |
|
FTA Safety Advisory 16-2: Third Rail Data Collection
|
FTA Safety Advisory 16-2
|
N/A |
N/A |
|
|
Train Crew Staffing: NPRM
Notice of public hearing and reopening of comment period
|
FRA-2014-0033 |
8/10/16 |
8/15/16 |
Draft Comments 7/22/16 |
Extension of Comment Period
|
Use of Locomotive Horns at Public Highway-Rail Grade Crossings: Notice of Safety Inquiry
|
FRA-2016-0010 |
N/A |
N/A |
|
|
Agency Request for Emergency Processing of Collection of Information by the Office of Management and Budget: Notice
|
FRA-2016-0002 |
N/A |
N/A |
|
|
Positive Train Control Systems: Final Rule |
FRA-2016-0012 |
N/A |
N/A |
|
|
DOT-OST: Notice: Adjustment to Rail Passenger Transportation Liability CapAdjustment to Rail Passenger Transportation Liability Cap |
N/A |
N/A |
N/A |
N/A |
N/A |
Best Practices for Designing Vision Field Tests for Locomotive Engineers or Conductors
|
FRA-2015-0123 |
N/A |
1/25/16 |
N/A |
|
Locomotive Alerters Resetting Without Direct Engineer Action |
Safety Advisory 2015-06 |
N/A |
N/A |
N/A |
N/A |
Information and Guidance on the Inspection, Testing, and Maintenance of Emergency Window Exits on Railroad Passenger Cars |
FRA Notice |
N/A |
N/A |
N/A |
N/A |
Ballast Defects and Conditions: Importance of Identification and Repair in Preventing Development of Unsafe Combinations of Track Conditions |
FRA Safety Advisory 2015–04 |
N/A |
N/A |
N/A |
N/A |
Operational and Signal Modifications for Compliance with Maximum Authorized Passenger Train Speeds and Other Speed Restrictions |
FRA: Safety Advisory 2015-03
|
N/A |
N/A |
N/A |
N/A |
Emergency Order Under 49 U.S.C.20104 Establishing Requirements for the National Railroad Passenger Corporation To Control Passenger Train Speeds at Certain Locations Along the Northeast Corridor |
FRA: Emergency Order No. 31 Notice No. 1 |
N/A |
N/A |
N/A |
N/A
|
Risk Reduction Program: NPRM |
FRA-2009-0038 |
4/22/15 |
4/28/15 |
Final Comments 4/28/15 |
Notice of comment period reopening 9/15/15 |
State Safety Oversight: NPRM |
FTA-2015-0003 |
4/22/15 |
4/28/15 |
Final Comments 4/28/15 |
|
Filing Process for Petitions for Waiver and Other Exemptions, Applications, and Special Approvals: Notice |
FRA-2015-0009 |
N/A |
N/A |
N/A |
|
Roadway Worker Authority Limits—Importance of Clear Communication, Compliance With Applicable Rules and Procedures, and Ensuring That Appropriate Safety Redundancies Are in Place in the Event of Miscommunication or Error |
FRA-Safety Advisory 2014-02 |
N/A |
N/A |
N/A |
Correction 12/1/14 |
Training-Qualification and Oversight for Safety-Related Railroad Employees |
FRA–2009–0033- |
N/A |
N/A |
Petition for Reconsideration Submitted by APTA, American Short Line and Regional Railroad Assoc., and National Railroad Construction and Maintenance Assoc. |
Final Rule: Delay of Implementation 4/27/18
Final Rule 11/7/14
Cover Letter for FRA Response to Petition of Reconsideration
FRA Response
|
Positive Train Control Systems (RRR)-Final Rule |
FRA–2011–0061 |
N/A |
N/A |
|
Final Rule 8/22/14 |
FRA Office of Railroad Safety: Collaborative Incident Analysis and Human Performance Handbook May 2014 |
N/A |
N/A |
N/A |
N/A |
|
Control of Alcohol and Drug Use: Coverage of Maintenance of Way Employees, Retrospective Regulatory Review-Based Amendments (RRR); Proposed Rule
|
FRA–2009–0039 |
11/17/14 |
11/25/14 |
Final Comments 11/25/14
Petition for Reconsideration
|
Final Rule Notice |
Signal Systems Reporting Requirements |
FRA–2012–0104 |
|
|
|
Final Rule |
Verification of Rail Vehicle Safe Stopping Distances in Terminal Stations |
Safety Advisory 14–2 |
|
|
|
|
Revisions to Passenger Train Emergency Preparedness Regulations |
FRA–2011–0062 |
N/A |
N/A |
N/A |
Final Rule 3/31/14 |
Passenger Train Exterior Side Door Safety NPRM |
FRA-2011-0063 |
N/A |
N/A |
N/A |
|
Critical Incident Stress Plans Final Rule
|
FRA-2008-0131 |
N/A |
N/A |
N/A |
|
Track Safety Standards; Improving Rail Integrity |
FRA-2011-0058 |
|
|
|
Final Rule 1/24/14
Final Rule Correction 1/29/14
|
Railroad Workplace Safety; Adjacent-Track On-Track Safety for Roadway Workers |
FRA–2008–0059 |
N/A |
N/A |
N/A |
Final Rule Amendment
Final Rule Response to Petitions |
Right-of-Way Worker Protection |
FTA Safety Advisory 14–1 |
N/A |
N/A |
N/A |
|
Operational Tests and Inspections for Compliance With Maximum Authorized Train Speeds and Other Speed Restrictions |
FRA Safety Advisory 2013–08 |
N/A |
N/A |
N/A |
|
Adjustment of Monetary Threshold for Reporting Rail Equipment Accidents/ Incidents for Calendar Year 2014 |
FRA–2008–0136, Notice No. 6 |
N/A |
N/A |
N/A |
Final Rule |
Second Interim Statement of Agency Policy and Interpretation on the Hours of Service Laws as Amended in 2008 |
FRA-2013-0011 |
11/18/13 |
11/25/13 |
|
|
Comment sought on scoping document for development of a proposed program comment to govern review of Positive Train Control Facilities under section 106 of the National Historic Preservation Act
Comment Sought on Draft Program Comment to Govern Review of Positive Train Control Facilities Under Section 106 of the National Historic Preservation Act.
|
WT Docket No. 13-240 |
11/08/13
2/7/14 |
11/15/13
2/12/14 |
Final Comments |
FCC Comments |
Critical Incident Stress Plans |
FRA 2008-0131 |
|
8/27/2013 |
Final Comments |
|
Emergency Order 28
FRA guidance |
N/A |
N/A |
N/A |
N/A |
|
Safety Advisory 2013-06 |
PHMSA 2013-0196 |
N/A |
N/A |
N/A |
|
Request for Extension - Periodic Brake Equipment Maintenance |
FRA-2007-28306 |
N/A |
N/A |
April 19, 2013 APTA Request |
June 25, 2013 FRA Approval |
Systems for Telephonic Notification of Unsafe Conditions at Highway-Rail and Pathway Grade Crossings |
FRA-2009-0041 |
N/A |
N/A |
N/A |
Final Rule 5/28/15
Final Rule; response to petition for reconsideration 3/15/13 |
Vehicle/Track Interaction Safety Standards; High-Speed and High Cant Deficiency Operations |
FRA-2009-0036 |
N/A |
N/A |
N/A |
Final Rule 3/13/13 |
Safety Advisory 2013-02; Low Speed, Wheel-Climb Derailments of Passenger Equipment with "Stiff" Suspension Systems |
Safety Advisory 2013-02 |
N/A |
N/A |
N/A |
|
Control of Alcohol and Drug Use: Addition of Post-Accident Toxicological Testing for Non-Controlled Substances Final Rule |
FRA-2010-0155 |
N/A |
N/A |
N/A |
|
National Highway-Rail Crossing Inventory Reporting Requirements |
FRA-2011-0007 |
N/A |
N/A |
N/A |
Final Rule 1/7/15
Response to Petition for Reconsideration 6/10/16 |
Alcohol and Drug Testing: Determination of Minimum Random Testing Rates for 2013. Notice of Determination
Notice No. 17 |
FRA-2001-11213 |
N/A |
N/A |
N/A |
Final Rule 7/7/15
Notice No. 20 12/28/15 |
FRA Locomotive Safety Standards |
FRA-2009-0094 |
N/A |
N/A |
N/A |
Final Rule 12/19/12 |
FRA - NPRM: System Safety Program
Reopening of Comment period
|
FRA–2011–0060 |
11/1/12
|
11/6/12
12/7/12
|
Request for extension of the comment period 11/2/2012
Final Comments 12/7/2012
|
Final Rule 8/12/16
|
FRA - NPRM Railroad Workplace Safety; Roadway Worker Protection Miscellaneous Revisions (RRR) |
FRA-2008-0086 |
10/10/12 |
10/19/12 |
Final Comments 10/19/2012 |
Final Rule 6/10/16 |
Statement of Agency Policy and Interpretation on the Hours of Service Laws as Amended; Response to Public Comment
Note: this document deals primarily with freight railroads but has applicability to passenger rail signal maintenance |
FRA-2009–0057
Notice No. 2 |
N/A |
N/A |
N/A |
N/A |
FRA - Notice of Proposed Rule Making - Passenger Train Emergency Systems II |
FRA–2009–0119, Notice No. 1 |
2/20/2012 |
3/5/2012 |
|
Final Rule |