APTA RT-SC-RP-001-02
Wayside Signal Ac Power System Inspection and Testing
Abstract
This recommended practice provides guidelines for inspecting and testing rail transit wayside signal ac power systems.
Keywords: ac, communication, inspection, maintenance, power, test, testing, transfer switch signal, wayside signal, wayside signal power system
Summary
None.
Document History
| Document Number | Version | Publication Date | Publication | Related Information |
|---|---|---|---|---|
| APTA RT-SC-RP-001-02 | 09/22/2002 | Published | Current |
Get Involved
Want to participate in the development of this document? Join the Working Group or Learn More