Skip to Content

APTA RT-SC-RP-001-02

Wayside Signal Ac Power System Inspection and Testing

Abstract

This recommended practice provides guidelines for inspecting and testing rail transit wayside signal ac power systems.

Keywords: ac, communication, inspection, maintenance, power, test, testing, transfer switch signal, wayside signal, wayside signal power system

Summary

None.

Document History

Document Number Version Publication Date Publication Related Information
APTA RT-SC-RP-001-02 09/22/2002 Published Current

Get Involved

Want to participate in the development of this document? Join the Working Group or Learn More