Recommended Practice
Wayside Signal DC Power System Inspection and Testing
Abstract
This recommended practice provides guidelines for inspecting and testing rail transit wayside signal dc power systems.
Document Number | Version | Publication Date | Publication | Related Information |
---|---|---|---|---|
APTA RT-SC-RP-002-02 | Rev. 1 | 01/31/2025 | Published | Current |
APTA RT-SC-RP-002-02 | Original | 09/22/2002 | Published | Superseded |
Keywords
Summary
Wayside dc power system inspection and testing procedures may be modified for each rail transit agency’s requirements but should contain the steps listed in this document as a minimum, with the intent of increasing reliability and reducing the risk of hazards and failures.
Get Involved
Want to participate in development of this document? Join the Working Group or Learn More